Completed Project: Pathfinder Dam Spillway
Owner: Bureau of Reclamation
Prime Contractor: ASI Construction
Completion date: Dec 2011
Overall scope of project: Provide high strength, low permeability concrete for new ogee weir at dam to raise dam level to avoid runoff during flood conditions.
Mobile’s role, including products furnished: Provide on-site portable ready-mix batch plant to produce large volumes of high strength super-plasticìzed concrete, both for ogee weir installation and back-fill concrete from existing dam to new ogee weir.
Quantity: Over 7,000 c.y.